
Completed
Municipal
Riverside Community — Municipal Water Upgrade
Riverside, CA2025
Back

Start a Similar Project



Project Overview
Deployed a multi-stage filtration network covering 12,000 households, eliminating PFAS and heavy metal contamination.
The Challenge
Legacy infrastructure had allowed PFAS and lead contamination to persist for years. The city needed a scalable solution that could be retrofitted into existing distribution infrastructure without service interruption.
Our Solution
We deployed point-of-entry treatment systems at 8 distribution nodes, each using granular activated carbon (GAC) and ion exchange for PFAS removal, followed by lead-specific media. All units are remotely monitored.
Key Results
PFAS reduced to non-detectable levels
12,000 households served
Lead reduction: >99.5%
Full deployment in 18 months
Project Specs
Households Served12,000
TechnologyGAC + Ion Exchange
Distribution Nodes8
Monitoring24/7 Remote
Services Provided
Water AnalysisEngineeringInstallationRemote Monitoring
Client
City of Riverside
Riverside, CA